Decorating And Assembly
When: June 15 & 16, 2010
Where: Marriott Hotel and Conference Center, Cool Spring, TN
Thierica's own Rob Brewer will be presenting a technical paper outlining cost savings initiatives for the paint industry.
Find out more at: www.4spe.org
Friday, February 26, 2010
Explosion Proof Air Handling Units
Circulating Air Saves Money
At Thierica we are experts at building equipment with savings in mind and our new explosion proof air handling units don't disappoint!
More and more of our spray booth systems utilize circulating air flow to reduce exhausted air volumes and increase BTU value for abatement equipment. So instead of buying a separate air handling unit to accomplish this let Thierica integrate it into the spray booth. That's precisely why we began building our own ex proof modules, to save you money.
At Thierica we are experts at building equipment with savings in mind and our new explosion proof air handling units don't disappoint!
More and more of our spray booth systems utilize circulating air flow to reduce exhausted air volumes and increase BTU value for abatement equipment. So instead of buying a separate air handling unit to accomplish this let Thierica integrate it into the spray booth. That's precisely why we began building our own ex proof modules, to save you money.
New System Production Launch in 2010
We began this year off right by launching our latest automated system. The system included four painting robots, three cleaning robots, our patented water wash booths, dual fuel ovens, and a state of the art energy savings and production monitoring software package.
As always the entire system was pre-built on our floor prior to shipment to ensure a quick and smooth production launch. To further reduce customer risk the robot programs were developed in our lab while the equipment was being fabricated allowing production to begin immediately after installation was complete.
When you are ready for a new system ask us how we can assist in launching your production process without fail!
As always the entire system was pre-built on our floor prior to shipment to ensure a quick and smooth production launch. To further reduce customer risk the robot programs were developed in our lab while the equipment was being fabricated allowing production to begin immediately after installation was complete.
When you are ready for a new system ask us how we can assist in launching your production process without fail!
Subscribe to:
Posts (Atom)